Paola Bridge
Malta
Bridge design, fabrication and installation
Total length: 26 m
Total weight: 15,000 Kg
Implementation period: 2019 - 2020
Commissioned by Infrastructure Malta to the Joint Venture between Bertazzon and a local partner, the pedestrian bridge connects Corradino and the MCAST Campus with the center of Paola and extends for 25 meters over the busy Dom Mintoff Road, previously known as Corradino Hill. The project involved the design, fabrication and installation of the bridge and ramp railings.