Rinaldi Palace

Treviso

Palazzo Rinaldi of Treviso – fire safety measures

Total weight: 15,000 Kg

Implementation period: 2021 - 2022

Commissioned by the City of Treviso, the work is part of the fire safety upgrade of the municipal headquarters in Palazzo Rinaldi. Bertazzon oversaw the study of details, production and installation of two interior staircases and the main exterior staircase, all of which were particularly detailed and aesthetically and architecturally accurate.

For the outdoor staircase, whose structure has the peculiarity of being completely cantilevered and appearing to be suspended, Bertazzon also took care of the supply and installation of the metal wall coverings, glazing and aluminum slat sunshades.

photo: arch. Marco Toté

Location

Street view