https://www.youtube.com/watch?v=k_PxLH9JP8A

Luqa Bridge

Malta

Luqa Bridge

Malta

Bridge construction

Total length: 31 m

Total weight: 43,000 Kg

Implementation period: 2019 - 2020

Commissioned by Infrastructure Malta to the Joint Venture between Bertazzon and a local partner, the bridge allows the creation of safer connections between Luqa, Gudja, the airport, the Institute of Tourism Studies and the surrounding area for all those traveling to on foot or by bicycle.

The project involved design, manufacturing and installation of the bridge, ramp parapets and access elevators.

Location

Street view