https://www.youtube.com/watch?v=k_PxLH9JP8A
Luqa Bridge
Malta
Luqa Bridge
Malta
Bridge construction
Total length: 31 m
Total weight: 43,000 Kg
Implementation period: 2019 - 2020
Commissioned by Infrastructure Malta to the Joint Venture between Bertazzon and a local partner, the bridge allows the creation of safer connections between Luqa, Gudja, the airport, the Institute of Tourism Studies and the surrounding area for all those traveling to on foot or by bicycle.
The project involved design, manufacturing and installation of the bridge, ramp parapets and access elevators.