Footbridge over the Canal Grande

Trieste

Construction of the cycle-pedestrian bridge over the Grand Canal, Ponterosso area in Trieste

Total length: 26 m

Total weight: 25,000 Kg

Implementation period: 2012

Single piece with central box-section load-bearing structure with reduced height, complete with lateral shelves to support the walking surface.
The bridge, in painted Corten, was completely built in the factory for logistical and environmental reasons, complete with stainless steel sheet flooring and glass parapets.

Only the handrail (which also houses the lighting system) and the part of the stone flooring were installed after the launch.