DHL warehouse
Hal Far (Malta)
DHL warehouse expansion and renovation
Surface: 700 sqm
Total weight: 40,000 Kg
Implementation period: 2020
Commissioned directly by Malta International Airport Plc, Officine Bertazzon carried out as Main Contractor the restoration and construction of the extensions of the cargo terminal at Malta's international airport, Luqa. The project involved modifications to existing steel structures; the application of fireproof coatings on existing elements, the construction of new steel structures including cladding works.
All these works were carried out in accordance with the drawings, specifications, metric bills and general conditions defined by a prestigious Maltese engineering firm.