Cableway Hong Kong-Ngong Ping (2 ropes)

Hong Kong

Hot-dip galvanized structural carpentry for the construction of a system for connection and urban transport between the airport and the mainland in Hong Kong.

Implementation period: 2004 - 2005

3 stations were built, a driving and a return station for a total weight of 220,000 kg plus an intermediate station for a weight of 490,000 kg.

The structures were entirely pre-assembled and assembled in Bertazzon, once the positive control was completed they were subsequently dismantled and shipped by sea to the construction site.