Restoration of the Sottoguda Serrai

Rocca Pietore (BL)

New walkway and 6 bridges

Total weight: 250,000 Kg

Implementation period: 2024

Sottoguda is among the locations that suffered the most damage following the 2018 Vaia storm, particularly its Serrai, or deep valley enclosed by two rock walls up to 200m high, within which a nature trail was developed.
With this intervention, the Veneto Region aims to restore the Greenhouses in order to reopen them to the public.
In this work with a very special context, among other things a Unesco heritage site, Bertazzon is engaged in the construction of a new footbridge - about 350 m long - that runs on the slopes of the valley anchored cantilevered on the rock, and on the installation of 6 bridges about 25 meters long, which complete the path inside the valley going to cross the Pettorina stream at as many points.

Bertazzon will also make all metal railings placed along the route with sheet metal wall coverings that function as embankments. All parts are made of corten steel.

The assignment of the job of Works Management relating to the general restoration and redevelopment of the Serrai di Sottoguda in the Municipality of Rocca Pietore (BL), CIG: 8380479E09-CUP J53H19001420001 was arranged with decree no. 1113 of 07.29.2020 via electronic procedure and was entrusted to the Temporary Grouping of Professionals consisting of:

Eng. Fabio Muraro
CONSTRUCTION MANAGER

Eng. Felice Gaiardo
OPERATIONS DIRECTOR (Working group coordinator and site expert)

Arch. Francesco Riva
CONSTRUCTION INSPECTOR (Landscape Expert)

Engineer Gaspare Andreella
OPERATIONS DIRECTOR (Expert in River Hydraulics)

Geom. Gaetano Slongo
D.O. ASSISTANT

Dr. Geol. Tiziano Padovan
OPERATIONS DIRECTOR (Expert in Landslides and Consolidation Works)

Arch. Francesco Casini
(Construction site monitoring)

Eng. Marika Righetto
(Expert in River Hydraulics)

Eng. Lorenzo Busnardo
(Civil works)

Dr. Geol. Chiara Siorpaes
(Evaluation of geosites and valorisation of the general geology of the Dolomites)

Junior Eng. Matteo Pozzobon
(Electrical systems and automation)

p.i. Lionello Colusso
Safety coordinator during execution