EGS
Poland
Metal carpentry for EGS structures
Total weight: 90,000 Kg
Implementation period: 2023 - 2024
For a major Multinational Company specializing in the design and production of ORC systems that exploit renewable energy, for an EGS plant located in Poland, Officine Bertazzon supplied steelwork structures to support power and heat generation systems.
In addition to the main structures, we provided secondary structures such as walkways, seafaring ladders, gratings, and piping supports. All structures provided were hot-dip galvanized.