Siemens Power Station
Delimara (Malta)
Fabrication of industrial-grade metal structures for Siemens' new gas-fired power plant in Malta
Total weight: 120,000 Kg
Implementation period: 2016
The fully painted structures with three-coat cycle (C5M environment) are functional for supporting the main facilities and piping. The whole is made in accordance with EXC3 of EN 1090-1.
All project management operated by Bertazzon is carried out in full compliance with the technical and quality requirements of the Siemens customer, of which Bertazzon is in fact an accredited supplier.